The project involves the rehabilitation of the existing ICTSI Administration Building located at the ICTSI compound, MICT, North Harbor, Manila City. The building, built during the late 1980s, is a 3-storey building with a total floor area of about 8,600 sq.m.

All floors of the building are currently occupied by offices while part of the roof deck has been converted into a canteen.

The rehabilitation involved the repair of damaged structural elements and structural retrofitting of the lateral force resisting elements of the building. It also includes architectural finishing upgrades and the renovation of the teller area at the ground floor. The existing helipad was also expanded to accommodate a much larger helicopter.

ACO performed the detailed design and construction management services for the project.