The existing bridge is an access bridge of the Continental Cement Corporation (COC) for their cement plant facility located in Norzagaray, Bulacan.

The existing bridge is a 25m long, 2 lane, 2 span bridge constructed using precast reinforced concrete T-beams with a cast in place reinforced concrete deck slab and reinforced concrete wall-type piers and abutments.

The bridge was originally designed to carry HS15 trucks and will be rehabilitated to carry HS20 trucks.

ACO performed the detailed engineering design for the rehabilitation of the bridge. The work includes material testing, preparation of the as-built drawings, seismic assessment of the bridge, repair of the concrete damages, and strengthening using Fiber Reinforced Polymer (FRP) composite materials.