The project consists of 2 production buildings owned by IRI Philippines Inc. located at the Carmelray Industrial Park II, Canlubang, Laguna.

The buildings have a total area of about 6,000 sq.m., and generally consist of structural steel frames with masonry walls and metal roofing. The structures are resting on shallow foundations.

ACO in association with Jurong Consultants (JTCI) performed the detailed engineering design for the project. ACO also provided engineering support during construction.