The project involves the site development of a 25-hectare property into a food processing plant complex. It is located at the Phividec Industrial Estate, Villanueva, Misamis Oriental and owned by Limketkai Manufacturing Corporation.

ACO performed the detailed engineering design services for the project. Some of the work comprises of the following:

  1. Overall site development planning.
  2. Site grading and storm drainage design.
  3. Road layout and design.
  4. Retaining walls and perimeter fence design.
  5. 2000 ton and 1000 ton corn oil vertical storage tanks.
  6. 500 ton fuel storage tanks.
  7. 30,000 gallon elevated water tank resting on driven pile foundation.
  8. One-storey, 1500 sq.m. corn shortening plant resting on driven pile foundation.
  9. One-storey, 1300 sq.m. corn receiving plant resting on driven pile foundation.
  10. An oil pipeline trestle using a 270m long multi-span conveyor trusses supported on steel pipe piles for Phase 1. The oil supply will be coming from a 40,000 DWT ship full load draft.
  11. A bulk conveyor trestle using multi-span conveyor trusses supported on steel pipe piles for Phase 2.
  12. A 168m-long loading platform with 8 breasting dolphins with 50 tons mooring bollard.