The Limketkai Pier Project in Phividec, Villanueva, Misamis Oriental is part of a proposed Food Processing Plant owned by Limketkai Manufacturing Corporation. The work comprises of the following:

  • Dredging and reclamation works.
  • An oil pipeline trestle using a 270m long multi-span conveyor trusses supported on steel pipe piles for Phase 1. The oil supply will be coming from a 40,000 DWT ship full load draft.
  • A bulk conveyor trestle using multi-span conveyor trusses supported on steel pipe piles for Phase 2.
  • A 168m-long loading platform with 8 breasting dolphins with 50 tons mooring bollard.
  • Mooring dolphins with 100 tons mooring bollard.

ACO performed the detailed engineering design for the project.