The project consists of several one-storey with mezzanine warehouse and production buildings owned by RBF Development Corporation, and located in the Carmelray Industrial Park 2, Calamba, Laguna.

The buildings have floor areas ranging from 2,000 to 4,000 sq.m., and were constructed using reinforced concrete frames with masonry walls, steel trusses and metal roofing with insulation.

ACO performed the detailed engineering design for the project.